Capital Works Management Framework, Guidance Note, Glossary, Published by the Government of Ireland Department of Finance in 2009 suggests that:
‘Function Analysis is a way of breaking down project objectives into their component parts and determining how they contribute to the overall project objectives. A completed function analysis shows what the financial investment ‘buys’ for a client. Successful function analysis drives innovative project decisions, and also forms a basis for risk management and for value management.’
‘The rough estimate of global cost of the entire project is often based on functional unit costs multiplied by number of units according to the established norms in a sector. For example, construction costs for a school could be based on a norm of 6 m2/per pupil @ €100/m2; so, a rough estimate for a 1,000 pupil school would be 6 x 100 x 1,000.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.